xIntegraDE
Menu

CausalGrids · BESS revenue intelligence

Is your BESS earning what it could?

Use CausalGrids software to review trading performance from the owner’s perspective. Compare like with like, explore performance drivers and quantify potential differences in euros.

Free BESS benchmarking & revenue check through 31 March 2027. Start with one asset and a recent optimiser report.

BESS scenario calculator

What does a capture difference mean?

200 MWhReference capacity

Four-hour reference battery · one cycle per day

Historical capture example · annual euro value assumed

95.6% → 99.2% · 3.6 percentage points · EUR80,000/MW/year assumed

Germany-Luxembourg

Illustrative annual day-ahead difference

€144,000
Value per percentage point€40,000per year

Scenario calculation using the assumptions shown. Not an asset revenue forecast or a measured recoverable revenue gap.

Adjust capture and euro assumptions

Capture is the share of the reference day-ahead opportunity earned, not price-forecast accuracy. The historical baseline uses yesterday’s prices; the comparison uses the published model.

An editable value at 100% capture. The default EUR80,000 is a scale assumption, not a verified maximum for the selected market, period or asset.

Historical example and sources

Public snapshot: 15 October 2026. Rolling 180-day model results for a four-hour battery and one cycle per day. 43 selectable zones represent 34 published rows. These are historical examples, not your optimiser’s results or a forecast.

Published capture board · Methodology · Working paper

How the euro calculation works

Annual difference = MW × assumed maximum per MW/year × (comparison share - baseline share) ÷ 100. The difference between capture shares is measured in percentage points, not relative percent improvement. Zero and negative differences are valid.

The calculator multiplies the difference between the two capture shares by your assumed annual maximum and battery power. Published capture shares retain the source model's efficiency and cost assumptions. This calculator makes no separate adjustments for efficiency, trading or imbalance costs, degradation or availability. For a matched assessment, the capture shares and the euro reference must use the same market, period, battery constraints and economic basis. This illustration does not establish that match.

Inputs. Outputs. Delivery.

A BESS comparison with a defined basis.

See how analysis is presented in a report →
You provide
Asset power and energy, operating constraints, the market and period, plus an available optimiser or operating report.
You receive
A scoped comparison against an agreed baseline, with calculation assumptions, data limitations and follow-up questions.
Delivery
Software-generated report outputs. Inputs, coverage, scope and price are agreed before work begins.

Related investment-report example; it does not validate the public calculator or establish operating performance.

What could the battery have earned?

Reconstruct a comparable historical opportunity using the same market, period and asset limits.

What explains the difference?

Separate forecasting, dispatch, availability, constraints and costs before assigning responsibility.

What is worth changing?

Prioritise material gaps in euros and track whether changes improve performance.

What is the theoretical maximum?

A hindsight reference: what the model could earn if it knew every relevant price in advance under its stated constraints. It measures the available opportunity; nobody can promise to achieve it.

Historical context for your market.

43 zones · 28 countries · public snapshot, 15 October 2026

Standardised four-hour battery, one cycle per day. Modelled day-ahead strategies compared with realised prices over a rolling 180-day window.

This selector changes the historical comparison. The euro illustration above retains its stated assumptions.

Germany-Luxembourg

Perfect-foresight maximum100%
CausalGrids modelled capture99.2%
Yesterday’s prices baseline95.6%

Source: CausalGrids public day-ahead benchmark, checked 15 October 2026. Methodology and limitations. The source describes a rolling 180-day window but does not specify its exact dates. Historical model results, not realised customer returns.

All markets and grouped results

43 selectable zones are represented in 34 published rows. Nordic and Baltic group results are not separate individual-zone measurements.

Market / groupCausalGridsBaselineDifference
Spain99.2%98.2%+1.0 pp
Portugal98.0%96.9%+1.1 pp
Greece94.2%91.0%+3.2 pp
Italy - North91.4%81.6%+9.8 pp
Italy - Centre-North91.9%83.0%+8.9 pp
Italy - Centre-South93.3%85.6%+7.7 pp
Italy - South93.9%86.4%+7.5 pp
Italy - Calabria92.3%84.8%+7.5 pp
Italy - Sicily91.9%87.1%+4.8 pp
Italy - Sardinia91.1%83.7%+7.4 pp
Germany-Luxembourg99.2%95.6%+3.6 pp
France97.3%94.7%+2.6 pp
Netherlands98.3%95.2%+3.1 pp
Belgium97.0%92.6%+4.4 pp
Austria96.7%93.4%+3.3 pp
Switzerland97.3%93.2%+4.1 pp
Poland96.9%90.3%+6.6 pp
Czechia96.4%93.4%+3.0 pp
Slovakia95.7%93.6%+2.1 pp
Hungary96.4%94.8%+1.6 pp
Romania96.3%94.1%+2.2 pp
Bulgaria90.0%87.1%+2.9 pp
Croatia96.2%94.7%+1.5 pp
Slovenia95.5%93.2%+2.3 pp
Denmark - West (DK1)96.6%93.8%+2.8 pp
Denmark - East (DK2)96.1%92.7%+3.4 pp
Sweden SE1 · SE2 · SE3 · SE485.9%72.4%+13.5 pp
Norway NO1 · NO2 · NO3 · NO4 · NO571.6%60.0%+11.6 pp
Finland81.0%56.6%+24.4 pp
Estonia · Lithuania · Latvia86.1%71.1%+15.0 pp
Great Britain83.3%61.8%+21.5 pp
Ireland (SEM)77.9%58.8%+19.1 pp
CAISO - SP1585.3%74.6%+10.7 pp
PJM - Western Hub95.9%93.4%+2.5 pp

How your review works

A simple start. An asset-specific assessment.

The free screening identifies initial findings, useful comparisons and missing information. A configured analysis models the actual duration, contracts, operating restrictions, costs and revenue streams supplied for your asset.

No battery control or API connection is needed to start. A recent provider report, specifications and market are enough for the first scoping conversation.

Evidence before a performance claim

  • Actual operating records and modelled alternatives are identified separately.
  • Public benchmarks are dated and keep their original scope.
  • Focus on differences that materially affect your asset’s revenue.
Analysis and ongoing service options

Illustrative software workflow · not a completed client case

Keep the optimiser, change the mandate or fix the operating constraint?

Customer question

Does the BESS earn less because of trading decisions, availability or the terms of the mandate?

Information used

Settlement and dispatch records, market prices, battery limits, availability and fees for the same period.

Alternatives assessed

The current strategy, a comparable dispatch scenario and changes to operating or contractual constraints.

Analysis outputs

A software-generated revenue bridge, sensitivities and performance-gap indicators: inputs for your team to assess potential improvements, operating constraints and monitoring priorities.

Public research and sample reports show the approach. A configured software analysis uses your private project data and scenarios to generate reviewable outputs and maintain the supporting data.

See how we structure an investment decision

One decision today. A maintained view tomorrow.

Start with a defined question. Add recurring support when you have recurring decisions.

01

Initial assessment

Define the decision, compare options and identify the information that matters.

02

Decision & evidence pack

Receive software-generated scenarios, assumptions, comparison results and supporting data for your review.

03

Portfolio monitoring

Keep material assumptions, performance and reporting current at an agreed cadence.

One agreed scope can combine analysis and evidence. Existing work is reused, with additional work and updates priced transparently.

Your next step

Free BESS benchmarking & revenue check

Start with one battery asset and a recent optimiser report. Get an initial revenue comparison, key findings and the next useful analysis steps. Request by 31 March 2027.

Request your free BESS check →