- Project IRR
- Equity IRR
View data table
| Category | Project IRR | Equity IRR |
|---|---|---|
| Conservative | 9.95 % | 11.43 % |
| Balanced | 11.18 % | 12.58 % |
| Aggressive | 17.08 % | 19.13 % |
| Risk Parity | 12.37 % | 13.98 % |
Inside the report · Investment check
A return figure alone does not explain an investment. These extracts show how revenue quality, lifecycle costs, climate pathways and shared infrastructure dependencies change the decision.
10 analytical chapters · read online · no registration
Read the report ↘Project and equity returns
Asset and portfolio effects
Physical and financial effects
Anonymised example analyses with different scopes. Assets, periods and reference bases are identified alongside each result. Modelled impacts are not measured operating results. The report scope is agreed for each assignment.
01Returns & valuation
Four operating profiles in the same example valuation show why a single IRR tells only part of the investment story. Project and equity returns sit side by side; net present value adds a value perspective.
Modelled internal rate of return · %
| Category | Project IRR | Equity IRR |
|---|---|---|
| Conservative | 9.95 % | 11.43 % |
| Balanced | 11.18 % | 12.58 % |
| Aggressive | 17.08 % | 19.13 % |
| Risk Parity | 12.37 % | 13.98 % |
Index · Balanced / central case = 100
| Category | NPV index |
|---|---|
| Conservative | 109 |
| Balanced | 100 |
| Aggressive | 164 |
| Risk Parity | 121 |
Scope: anonymised three-asset portfolio. Model outputs, not realised performance. Risk Parity is a reported comparison profile.
02Revenue quality
The report separates the revenue stack by payment basis and risk. This is more useful than a single revenue curve: availability, contracted energy delivery and market revenue must also fit the physical operating plan.
Extract from the revenue structure and review logic
Payments for committed capacity or availability. Review duration, counterparty, availability requirements and potential deductions.
Payments on energy actually delivered. Review delivery obligations, billable volume, price rules and operating restrictions.
Arbitrage and ancillary services use the remaining operating capacity. Review price and volume risk, market access, costs and competition between revenue streams.
| Review question | What the report compares |
|---|---|
| Which view supports debt underwriting? | Contract-supported revenue, delivery obligations and debt service, alongside the full equity view. |
| What happens after contracts expire? | Remaining merchant revenues, renewal assumptions and later investment needs. |
| What can actually be collected? | Gross revenue, operating costs, financing and distribution rules are shown separately. |
Scope: qualitative structure of an asset report. These questions do not replace review of the actual contracts.
03Lifecycle costs
Acquisition is the largest cost item, but it is not the whole funding requirement. The lifecycle comparison puts initial investment, operations, augmentation and decommissioning on a common present-value basis.
Shares of present-value cost · 30 years · %
of total present-value cost
operations, lease, augmentation and decommissioning
with initial investment = 100
| Cost item | Question for the investment decision |
|---|---|
| Operations & maintenance | Which services, price changes and availability obligations does the contract actually cover? |
| Capacity augmentation | When is additional capital needed, and how does a different operating plan change that timing? |
| Decommissioning | Which end-of-life obligations are financially accounted for? |
Scope: one separate sample asset, Balanced profile, 30-year present values. Repowering is a separate option and is excluded from this cost base. These values are neither a nominal budget nor a supplier quotation.
04Capital & distributions
Capital calls and distributions answer different questions. The report links project milestones to liquidity planning and shows how modelled proceeds are divided between investors and management.
Share of initial investment · %
| Category | Capital call |
|---|---|
| Start | 15 % |
| Equipment order | 25 % |
| Civil works / EPC | 30 % |
| Commissioning | 25 % |
| Retention release | 5 % |
Model structure · years 1–30 · %
Example of a multi-tier distribution structure
First, repay contributed capital under the agreed structure.
Then the agreed preferred return, to the extent distributable cash is available.
Then any contractual catch-up and the split of the remaining surplus.
Scope: modelled three-asset portfolio. The distribution structure is an analytical example, not a contractual or product offer from xIntegra.
05Event stress
An event does not affect every asset in the same direction. The stress matrix reveals whether an aggregate gain conceals individual losses, and which events put pressure on the whole portfolio.
Relative to each central case · %
| View | Asset A | Asset B | Asset C | Portfolio |
|---|---|---|---|---|
| Financing / country risk | -12.1 % | -8.7 % | -10.4 % | -10.2 % |
| Storage premium −20% | -10.7 % | -7.7 % | -14.5 % | -9.6 % |
| Interconnector disruption | 12.8 % | 9.2 % | -33.2 % | 5.2 % |
Portfolio index after the event
Portfolio index after the event
Portfolio index after the event
Scope: three-asset portfolio. Portfolio index before each event = 100. Events are separate model tests, not forecasts or occurrence probabilities.
06Concentration & dependency
The report reads value concentration alongside return correlation and infrastructure dependencies. This turns an asset list into a view of the risks the assets actually share.
Three positions · %
Pairwise return correlation · −1 to +1
| View | Asset A | Asset B | Asset C |
|---|---|---|---|
| Asset A | 1 | 0.97 | 0.55 |
| Asset B | 0.97 | 1 | 0.55 |
| Asset C | 0.55 | 0.55 | 1 |
| Dependency | Example finding | Implication for review |
|---|---|---|
| Value concentration | Assets A + B account for 87.5% of NPV. | A disruption affecting the pair has high economic relevance. |
| Shared infrastructure | A and B share a grid node; C uses a different one. | Model shared failure paths separately. |
| Counterparties | Operators, trading, O&M, technology and financing can introduce further shared dependencies. | Review contractual and supplier concentration alongside geographic diversification. |
Scope: anonymised three-asset portfolio. The exhibit shows selected dependencies, not a complete network topology.
07Climate & financial effects
Climate risk is not a single haircut. Physical hazards, transition costs and changing revenue opportunities act together on asset value. In this separate asset example, modelled revenue benefits outweigh transition costs under the net-zero pathway.
One sample asset · 30-year horizon · Current Policies = 100
| Category | NPV index |
|---|---|
| Current Policies | 100 |
| Delayed Transition | 141.8 |
| Divergent Net Zero | 154.5 |
| Net Zero 2050 | 200 |
| Climate pathway | Physical risk | Transition risk | Revenue effect in the example |
|---|---|---|---|
| Current Policies | Very high | Low | No offsetting uplift |
| Delayed Transition | High | Medium | Partial uplift |
| Divergent Net Zero | Medium | High | Partial uplift |
| Net Zero 2050 | Low | High | Stronger uplift |
Scope: one separate model asset, not the three-asset portfolio in the other chapters. Index values compare scenarios; they are not returns or probabilities and cannot be transferred to other locations.
08Augmentation & options
The operating plan affects both revenue and the timing of later investment. The report compares scheduled capacity augmentation with separate decisions on repowering, expansion or deferral.
Operating years 0–30 · orange dots: modelled events · band: repowering decision in year 20
| Profile | Augmentation in operating year |
|---|---|
| Conservative | 17, 30 |
| Balanced | 15, 28 |
| Aggressive | 10, 18, 26 |
| Risk Parity | 15, 28 |
Share of option value · %
Timeline: one separate sample asset. Option shares: three-asset portfolio. Option values are model valuations of future choices, not promised value gains.
09Portfolio operations
A portfolio can combine shared services. The report separates the potential cost effect from whether the operational and contractual conditions actually support it.
Index · separate operations = 100
| Category | Annual operating cost |
|---|---|
| Separate asset operations | 100 |
| Combined portfolio operations | 88 |
Shared procurement and mobilisation; assess service quality and response capability separately.
Shared teams and systems; consider concentration in a single service provider.
Insurance, legal and audit; reconcile scope and responsibilities.
Scope: modelled comparison for the three-asset portfolio. The 12% assumption is neither a forecast nor a savings commitment.
10Decision & due diligence
Value comes from connecting a finding to its economic meaning and the next review point. The report can support an investment decision, focus further data requests and prioritise actions.
| Example finding | Decision implication | Next review point |
|---|---|---|
| Material return differences between operating profiles | The profile is part of the investment thesis. | Reconcile revenue assumptions, delivery obligations and operating plan with the mandate. |
| A + B carry 87.5% of value and share a node. | Shared infrastructure is economically material. | Review failure paths, alternative supply and protective measures. |
| Portfolio +5.2%, Asset C −33.2% in the same event | The portfolio total can conceal asset-level risk. | Review asset-level liquidity, lending covenants and interventions. |
| First augmentation in year 10, 15 or 17 depending on profile | The operating plan changes capital commitments. | Reconcile maintenance, warranties, replacement budget and financing reserve. |
| Physical and transition risks move differently. | A single climate haircut is too coarse. | Assess local hazards, insurance, revenue effects and adaptation together. |
Further chapters connect financial, grid and societal effects.
| Value perspective | Typical analysis | Important boundary |
|---|---|---|
| Investor | Cash flows, NPV, project and equity returns | Cash flows that the investor can actually collect |
| Grid operator | Reliability, network losses, flexibility and ancillary services | Technical or regulatory benefit is not automatically investor revenue. |
| Society & environment | Emissions, air quality, local economic activity and impacts of supply disruption | Societal benefit is reported separately, not added to distributable cash flow. |
This preview shows selected analyses from different model examples. Report scope, data basis and depth of review are defined for the specific assignment.
xIntegra · Investment check
Let us identify which analyses offer the greatest decision value for your asset or portfolio.
Asset type, location, project status, grid connection and financial inputs. Define the decision: acquisition, financing, prioritisation or a change in operations.
An investment report configured around your question: transparent valuation views, explicit assumptions, scenarios and findings that prepare your decision.
This preview is not an audit opinion or certification.