Establish the baseline.
Agree one facility or site decision. Review connection information, load requirements, facility data and material gaps. Configure the software with alternatives validated by your technical specialists.
Data centres · Investors, developers & operators
Assess a new site, an expansion or an operating facility. Compare grid connection options and timing, phased IT capacity, energy costs and resilience in a defined software pilot.
A defined paid software pilot, with scope and pricing agreed before work begins.
Investment · Expansion · Operations
What you receive
The software pilot generates a comparison of your agreed options, their modelled costs and operating implications, available data and gaps that could change the results.
Your appointed technical advisers supply and validate engineering inputs. xIntegra supports software configuration, data integration and interpretation of the model outputs.
One connected commercial journey
Agree one facility or site decision. Review connection information, load requirements, facility data and material gaps. Configure the software with alternatives validated by your technical specialists.
Assess capital, operating effects and sensitivities. Export the option comparisons, their conditions and supporting data for your investment review and reporting.
Where recurring needs justify it, agree updates to assumptions, risks and reporting. Compare actual performance with expectations when operating data is available.
The pilot establishes the scope and usefulness of the analysis. Ongoing monitoring is a separately agreed service, with assets, update frequency and responsibilities defined.
Illustrative example · not completed customer work
A developer wants to compare a potentially earlier, flexible connection with waiting for firm capacity at a candidate site.
Documented grid-operator terms, phased IT demand, workload flexibility, BESS costs, cooling and water design, and required continuity of service.
Wait for firm capacity; or use a flexible connection with phased commissioning, BESS and an agreed operating envelope.
A comparison of timing assumptions, investment, curtailment exposure and operating costs, plus conditions to resolve before commitment and a label-readiness data plan.
Connection availability and restrictions must be confirmed with the grid operator. For a new build, design estimates support scenarios; they do not establish an operating label grade.
What the EU wants, in simple terms
The new EU label is intended to make data centre efficiency easier to understand. Its adopted design includes separate grades based on energy efficiency and water intensity. Consistent, traceable facility data is the starting point.
The commercial question goes further: which improvements reduce cost or risk, and are they worth the investment?
Understand the rules and timeline →Total facility energy divided by IT energy. It shows the energy used by cooling, power distribution and supporting systems relative to computing.
Water use relative to IT energy. It makes the water implications of operation visible.
Improving one indicator can involve a trade-off in the other. The label alone does not measure resilience or investment value.
The analytical foundation
The project and site analysis connects a digital twin of the electricity grid with climate, socioeconomic and resilience factors. The software pilot would combine that context with your facility data and technically validated inputs.
Public SSI reports demonstrate the approach. The configured software uses private project data and tailored scenarios, with implementation support and data updates within the agreed scope.
Explore grid and asset resilience →Start with the evidence you have
See which power, facility and reporting information would help scope an assessment. Use it with your operations, development or engineering team.
Open the readiness checklistTell us the country, development or operating status, available data and decision deadline. We will assess the fit for a selected paid pilot and propose a defined scope, outputs and technical responsibilities.
Discuss your power strategyEngagements and pricingStatus: 16 October 2026. The new label act remains under EU scrutiny; existing reporting applies separately. xIntegra supports preparation and analysis. Official labels are to be issued through the EU system.